Installing Radiant Tubing before the Concrete is Poured

March started off with more snow, slowing us down a little more.  However, the last week has been really warm and we’re picking up steam now.  Another inch of foam insulation was installed along with a layer of welded-wire lath.

The above photo was taken March 10th – we received 4 inches of snow that night. The next day was sunny and plus 12 and we started laying the tubing for the radiant floor.

Advertisements
This entry was posted in Construction and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s